a new campus for linz
a clean form
the campus presents itself as a calm, clearly structured building comprising two sections that are slightly offset from one another. this offset gives the building a distinctive form without making it overly prominent. its height is deliberately kept below the maximum limit of 32 m, allowing it to blend naturally into its surroundings. generous setbacks and a striking overhang also create sheltered areas and give the building an inviting appearance.
open pathways and vibrant spaces
at the centre lies the new sparkassenplatz – a spacious, green open space that serves as a meeting place and the campus’s focal point. open pathways, good sightlines and clear orientation ensure that visitors can find their way around quickly and enjoy spending time here. the existing tree population will be preserved and expanded, creating a pleasant microclimate. at the same time, the campus is well connected to footpaths, cycle paths and public transport, whilst car traffic is deliberately kept to a minimum.
sustainability and flexible use
the design ensures sustainable management and flexible development over many years. flexible floor plans allow for a variety of uses, whilst central areas such as training rooms, conference zones and communal spaces are easily accessible. a green roof with photovoltaic panels supports the energy supply and promotes biodiversity. Efficient building services, resource-efficient materials and robust construction ensure that the campus can be operated in a manner that is both environmentally and economically sustainable.
| completed (competition) | 2026 |
| country | AUT |
| city | linz |
| size | 14.300 m2 |
| client | sparkasse oberösterreich |
| project architect | gil cloos |
| team | fabian kahr emma bomertl johanna sieve christine stolz |
| landscape design | atelier dede |
| structural engineering | werkraum ingenieure |
| climate angineering | larix engineering |
| MEP planning | hemera |
| fire protection | fire-X |
| office planning | team gnesda |
| cost estimation | L-bau |
| visualization | visualarch |
| model | modellwerkstatt gregor kraxner |






















![[Translate to English:] [Translate to English:]](/fileadmin/_processed_/c/c/csm_01_BIOG-rendering-exterior-_c_querkraft-mangoshake_a6e475d34d.jpg)
![[Translate to English:] [Translate to English:]](/fileadmin/_processed_/c/a/csm_HOS-fassade-DSC4744_45-_c_-querkraft-hertha-hurnaus_5d787875c8.jpg)